Cost Analysis of The Construction Project for the Malaka Regency Office Building Using the Critical Path Method (CPM) Thomas Aquino Seki; Andi Patriadi; Sajiyo Sajiyo
Journal of Social Science Vol. 6 No. 2 (2025): Journal of Social Science
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Efficient construction project management is crucial to ensure quality and timely completion within budget constraints, especially for large-scale infrastructure projects. This study examines the application of the Critical Path Method (CPM) in accelerating the construction schedule of the Malaka Regency Regent's Office. The project faced various challenges, including frequent delays caused by design changes, unpredictable weather conditions, labor shortages, and inadequate material or equipment supply. These challenges often disrupted the progress and efficiency of the project, necessitating an effective solution to mitigate potential time and cost overruns. To address these issues and align project progress with the original plan, CPM was utilized to identify critical paths, eliminate lag times, and optimize the overall project schedule. Using CPM analysis and Microsoft Project 2019 software, the project's original duration of 180 calendar days was successfully reduced to 100 calendar days. This acceleration was achieved by streamlining interdependencies between critical activities and optimizing work schedules without increasing project costs. The findings highlight the significant role of CPM in achieving time savings while maintaining the planned budget of IDR 94.59 billion. Moreover, this study demonstrates that proper scheduling, coupled with optimization techniques, can significantly enhance the efficiency and effectiveness of construction projects. These results underscore CPM's potential as a valuable tool for project managers to ensure timely completion without compromising quality or incurring additional costs. This research contributes to the growing body of knowledge in construction project management and offers practical insights for managing similar projects in the future
The Influence Of Operating Costs On The Sensitivity Of Financial Viability Case Study: Construction Of South Surabaya Regional General Hospital Rachma Damayanti; Andi Patriadi; Sajiyo Sajiyo
Journal of World Science Vol. 4 No. 2 (2025): Journal of World Science
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jws.v4i2.1282

Abstract

This study evaluates the financial feasibility of constructing the South Surabaya Regional General Hospital using key investment evaluation methods, including Net Present Value (NPV), Internal Rate of Return (IRR), benefit-cost ratio (BCR), and Payback Period (PP). The study also examines how changes in management costs affect the project's financial viability. Data collected includes both initial investment costs and ongoing operational expenses. The findings indicate that the project is financially viable, with a positive NPV, an IRR higher than the required rate of return, and a payback period shorter than planned. Sensitivity analysis highlights that management costs significantly influence the project's feasibility. These insights can help the Surabaya City Government optimize hospital management costs and ensure the sustainability of healthcare projects.
Project Management Efficiency Strategy for Public Safety Center (PSC) Building in Probolinggo Regency Lucky Hendra Saputra; Andi Patriadi; Sajiyo Sajiyo
Journal of World Science Vol. 4 No. 2 (2025): Journal of World Science
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jws.v4i2.1283

Abstract

This research examines the efficiency of managing the construction of the Public Safety Center (PSC) building in Probolinggo Regency. Effective management ensures the project meets its timeline, budget, and quality goals. We used a method called Earned Value Analysis to track progress and identify potential issues early on. Key indicators like the Cost Performance Index (CPI) and Schedule Performance Index (SPI) helped us understand how well the project was performing in terms of cost and schedule. The research revealed challenges such as material delays and labor shortages, which impacted the project's efficiency. By analyzing these issues, we propose solutions to improve project planning and execution, focusing on better resource allocation and scheduling. The findings offer valuable insights for future construction projects, helping to minimize delays and overspending. This research emphasizes the importance of identifying project performance issues promptly to ensure overall success. The recommendations can guide improvements in construction project management, ensuring projects are completed on time, within budget, and to the required quality standards.
Cost Analysis of The Construction Project for the Malaka Regency Office Building Using the Critical Path Method (CPM) Thomas Aquino Seki; Andi Patriadi; Sajiyo Sajiyo
Journal of Social Science Vol. 6 No. 2 (2025): Journal of Social Science
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Efficient construction project management is crucial to ensure quality and timely completion within budget constraints, especially for large-scale infrastructure projects. This study examines the application of the Critical Path Method (CPM) in accelerating the construction schedule of the Malaka Regency Regent's Office. The project faced various challenges, including frequent delays caused by design changes, unpredictable weather conditions, labor shortages, and inadequate material or equipment supply. These challenges often disrupted the progress and efficiency of the project, necessitating an effective solution to mitigate potential time and cost overruns. To address these issues and align project progress with the original plan, CPM was utilized to identify critical paths, eliminate lag times, and optimize the overall project schedule. Using CPM analysis and Microsoft Project 2019 software, the project's original duration of 180 calendar days was successfully reduced to 100 calendar days. This acceleration was achieved by streamlining interdependencies between critical activities and optimizing work schedules without increasing project costs. The findings highlight the significant role of CPM in achieving time savings while maintaining the planned budget of IDR 94.59 billion. Moreover, this study demonstrates that proper scheduling, coupled with optimization techniques, can significantly enhance the efficiency and effectiveness of construction projects. These results underscore CPM's potential as a valuable tool for project managers to ensure timely completion without compromising quality or incurring additional costs. This research contributes to the growing body of knowledge in construction project management and offers practical insights for managing similar projects in the future
Risk Mitigation Analysis in the Construction of Dormitories for Students of Riyadlus Sholihin Islamic Boarding School, Probolinggo City Febri Aditya; Budi Witjaksana; Sajiyo Sajiyo
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 4 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i4.454

Abstract

The implementation of construction projects often faces various risks that can lead to delays, cost overruns, and decreased quality of work. One example occurred in the project to build a dormitory for students of the Riyadlus Sholihin Islamic Boarding School in Probolinggo City, which experienced a time deviation despite acceleration efforts. This shows the importance of implementing systematic risk management to identify and address potential risks from the beginning of project implementation. This study uses a descriptive quantitative approach through the dissemination of questionnaires and interviews to related parties in the project. The analysis was carried out using the Severity Index method to calculate the level of probability and impact of each risk, as well as the probability and impact matrix to determine the level of risk significance. The dominant risk is then further analyzed to determine mitigation actions. The results of the study showed five risks with a "Very High" level, namely the preparation of the wrong work method, poor coordination between parts, the accuracy of completing work within a certain duration, poor planning and scheduling, and low labor productivity. Mitigation strategies are developed to reduce the impact of these risks, including through training, improved communication, the use of planning software, and strengthening the monitoring system. This research makes a real contribution to the risk management of construction projects in a more effective and structured manner.
Analysis of the Acceleration of Implementation Time Using the Crashing Method in the Construction of the Purworejo Bridge, Mojokerto Regency Muchamad Farchan; Budi Witjaksana; Sajiyo Sajiyo
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 4 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i4.458

Abstract

Bridge infrastructure plays an important role in supporting connectivity and regional economic growth. However, in their implementation, bridge construction projects often face delays due to technical factors such as weather, soil conditions, as well as managerial and coordination constraints. One of them occurred in the Purworejo Bridge construction project in Mojokerto Regency which experienced a delay in progress of -14.88% in the 12th week of implementation. This delay requires accelerated efforts so that the project is not included in the critical contract category. This study seeks to examine the approach of accelerating implementation time through the Crashing method through increasing working hours (overtime) and calculating costs efficiently to mitigate delays. The methodology used includes the formulation of a network using Microsoft Project, the identification of critical paths through the Critical Path Method (CPM), and the calculation of acceleration costs based on Cost Slopes. The results of the analysis show that the acceleration of work can be achieved both technically and economically. This method allows the project to reduce delays, thus removing them from the classification of vital contracts. The study significantly improved the decision-making process for the timely and cost-effective implementation of development projects.