Pemodelan Metode Elemen Hingga Balok Beton Bertulang dengan Perkuatan CFRP (Carbon Fiber Reinforced Polymer) yang Dikenai Lentur dan Geser Rada, Stefanus; Aptiyasa, Putu A. A.
Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) Vol 4 No 1 (2025)
Publisher : Teknik Sipil, Politeknik Negeri Ketapangg

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/rigid.v4i1.1759

Abstract

Reinforced concrete beams as structural elements are designed to withstand working load. Expenses that exceed the capacity of the beam section, would result in the failure load bearing beams in flexure and shear. In this analysis, the beam with two point loading using CFRP (Carbon Fiber Reinforced Polymer) as reinforcement against bending and shear capacity.Modeling carried out by the three dimensional shape, using the Abaqus Student Edition program 6.14. There are three sections in the analysis is the eight point solid elements (beams), shell element (CFRP), and truss elements (reinforcement), using the concept of embedded elements and tie fuction. The steps that must be overcome in the process of analysis is pre processing, simulation and post-processing.The results of the analysis of Abaqus Student Edition 6.14 with experimental results performed by others, that the concrete beams reinforced by CFRP reinforcement subjected to bending and shear, did not show a significant difference in the difference in value. The beams are subjected to bending has a difference of values, namely: the type of R1 = 8,197%; R2 = 1,443%; R3 = 1,393%; EBR_M 1 layer = 4,360%; EBR_M 2 layers = 2,390%; and EBR_M 3 layers = 0,115%. While the beam is subjected to shear has a difference of values, namely: the type A10_R = 0,199%; A10_S = 22,055%; A10_M = 0,770%; A12_R = 0,429%; A12_S = 39,546%; A12_M = 21,421%; B10_R = 10,781%; and B12_R = 8,322%.
Cost Model Estimasi Konseptual Untuk Bangunan Gedung Rumah Sakit Aptiyasa, Putu A.A.; Effi, Cosmas P.Y Pao; Rada, Stefanus
Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) Vol 4 No 2 (2025)
Publisher : Teknik Sipil, Politeknik Negeri Ketapangg

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/rigid.v4i2.1761

Abstract

Implementation of the hospital building project, have a ways of estimation in accordance with the phases of the project. In the early stages of project planning, (owner) requires the estimated cost to construct the project budget. So it is necessary to develop cost estimation model that is easy to use, accurate and reliable. This research planning to develop a model estimation on stage initial project planning, easy with a fairly accurate results. Development method uses the principle of " Cost Significant Model" and the multiple linear regression. 6 data obtained using the method of work packages BoQ (Bill of Quantity) hospital building with details of data among 5 work packages that have been realized from fiscal year 2011 - 2014 were compared with 1 package of work to be performed