This Author published in this journals
All Journal GEMA EKONOMI
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Metode Pengendalian Pemesanan Bahan Baku Penolong Roda Kereta Api (Bogie) PT. Barata Indonesia Di Gresik Elan, Umi; Fahmi, Mohammad Alvin
GEMA EKONOMI Vol 8 No 1 (2019)
Publisher : Fakultas Ekonomi Universitas Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55129/https://doi.org/10.55129/.v12i4.2927

Abstract

This study tries to study the method of converting the auxiliary raw materials for the best train wheels (bogie) at PT. Barata Indonesia. This research is important in reducing the total cost of completion issued by PT. Barata Indonesia. This study uses descriptive quantitative method of submission of raw materials in the form of Economic Order Quantity (EOQ), and Just In Time (JIT). Pepset P-02 will be better by using the Economic Order Quantity (EOQ) method, while the control of Kalminex Type FM 100-A100 / 130 raw materials will be better by using the Just In Time (JIT) method Keyword: EOQ, JIT, Total Inventory CostDOI : 10.5281/zenodo.3474547
Analisis Metode Pengendalian Pemesanan Bahan Baku Penolong Roda Kereta Api (Bogie) PT. Barata Indonesia Di Gresik Elan, Umi; Fahmi, Mohammad Alvin
GEMA EKONOMI Vol 8 No 1 (2019)
Publisher : Fakultas Ekonomi Universitas Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55129/https://doi.org/10.55129/.v12i4.2927

Abstract

This study tries to study the method of converting the auxiliary raw materials for the best train wheels (bogie) at PT. Barata Indonesia. This research is important in reducing the total cost of completion issued by PT. Barata Indonesia. This study uses descriptive quantitative method of submission of raw materials in the form of Economic Order Quantity (EOQ), and Just In Time (JIT). Pepset P-02 will be better by using the Economic Order Quantity (EOQ) method, while the control of Kalminex Type FM 100-A100 / 130 raw materials will be better by using the Just In Time (JIT) method Keyword: EOQ, JIT, Total Inventory CostDOI : 10.5281/zenodo.3474547