Tedja, Michael
Prosiding Seminar Kota Layak Huni / Livable Space

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Perbandingan Metode Konstruksi Plat Lantai Sistem Double Wire Mesh Dengan Sistem Half Slab Tedja, Michael; Prisilla, Anastasia; Carolina, Carolina; Wiharyanto, Dimas E. J.; Susiyo, Johnsen
ComTech: Computer, Mathematics and Engineering Applications Vol 4, No 2 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i2.2527

Abstract

Floor plate is a structure on two-story buildings or more. Like other structures, floor plate also develops over time. Demands a shorter time jobs at a cheaper cost are some reasons for structures development of house construction. Floor plate can be constructed with two different way: conventional which uses double wire meshand modern uses half slab. The purpose of this study is to determine which floor plate construction methods of double wire mesh and half slab is more efficient in terms of cost and time. The study is conducted using survey, comparative analysis and literature study. The results of this study indicate that both methods have advantages and disadvantages. Double wire mesh method takes cheaper construction costs while half slab method takes faster construction time.
Analisa Rasio Parkir Mobil untuk Kantor Swasta di Jakarta Tedja, Michael
ComTech: Computer, Mathematics and Engineering Applications Vol 4, No 1 (2013): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v4i1.3930

Abstract

Jakarta's economy grew rapidly accompanied by the rapid growth of private office buildings in different areas of the city. This condition causes the need for car parking facilities at any existing private office buildings. Given the past 20 years, the Jakarta administration has never revised standard parking requirement in Jakarta. It causes the need be reviewed, to the extent appropriate parking ratio for a private office in the current period. This research is carried out on a number of park buildings at offices in Jakarta, the lower and upper limits of the implementation, then compared to the city standard parking. The results showed that the ratio standard park in Jakarta is no longer eligible based on the facts found.
Comparison Formwork Wood Sloof to Batako Viewed from the Aspect of Time and Cost Tedja, Michael; Halim, Hendra; Divaninta, Kezia; Hidayat, Valentina
ComTech: Computer, Mathematics and Engineering Applications Vol 6, No 4 (2015): ComTech
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/comtech.v6i4.2174

Abstract

Concrete-Mold is one of the most important elements of a building’s structural system. Like other structural systems, the concrete mold placed right after the main wiring structure placed. The function of the concrete mold is to specify the size of the concrete structure itself. The needs of an efficient construction timeand cost are some reasons of the decent and fast development of home-design structure. Sloof’s concrete-mold for two-floor houses can be done with two different materials, i.e. wooden plywood material and bricks. The difference usage of these two materials is the background of this research. The purpose of research is to find out the best way in time and cost efficiency of these two materials. This research carried out using the method of library studies, survey, and comparative study. The result of this research showed that the cost of the brick making the job of sloof concrete mold cheaper and faster. Thus, sloof concrete mold making is one of the project solutions that are more efficient in terms of time and cost.