Developing The Organization Integration Through Problem/Solution Tree: A Case Study of EPC Solar Panel Company Widodo, Tabita Emmanuella; Smatupang, Togar Mangihut; Kembaren, Pennoh Philips
Journal of Applied Business, Taxation and Economics Research Vol. 4 No. 5 (2025): June 2025
Publisher : PT. EQUATOR SINAR AKADEMIA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54408/jabter.v4i5.424

Abstract

Rapidly growing based on the company’s revenue, the scale and number of projects that have been increased every year, the margin of each project has gap that does not meet with the targeted plans. Projects most of the time are over budget, delayed, and company can’t identify the risk management they faced from the calculation, construction, until the after-service. ATW has identified these circumstances as challenges to be mitigate. Based on sums of all the projects budget in Q2 in 2024, the highest activities that overbudget compared to the planning is Installation by 74.6%. Compared to the initial budget, the installation cost nearly double. The company want to know what cause the gap of over budget and uncontrollable additional cost and how to improve the budgeting. With Problem and Solution Trees to understand the root caused and the solution, this research explores problems that related to projects to perceive the essentials. Developing Organizational Integration for the company related to organization, project, and cross-departments. Based on the Problem and Solution Tree, the causes are unintegrated and uncoordinated system, lack of standardize procedure, and miss communication in projects. Meanwhile, the system model is organizational integration where will improve the gaps with integrating the cross department and make it sustain for evaluating the closing project. This research’s aim is for the expenses to be controlled and monitored to gain the margin and for the company to expand the business.
Production Utilized Capacity Improvement Proposal Using Lean Six Sigma: A Case Study At Plastic Injection Process PT Indonesia Trc Industry Ruhaiya, Fikka; Yudoko, Gatot; Kembaren, Pennoh Philips
EKOMBIS REVIEW: Jurnal Ilmiah Ekonomi dan Bisnis Vol 13 No 3 (2025): Juli
Publisher : UNIVED Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37676/ekombis.v13i3.7490

Abstract

The plastic injection production process often faces problems with products that do not meet quality standards (not achieved), which causes an increase in defect rates, decreased efficiency and failure to achieve production targets. This study aims to identify the main causes of these problems and apply the Lean Six Sigma method to improve productivity. Pareto analysis shows that most of the main causes of plastic injection production activities are caused by machine trouble. Through the DMAIC (Define Measure, Analyze, Improve, Control) approach, it was found that the factors causing machine trouble were influenced by unscheduled machine maintenance, temperature settings, pressure, and cycle time. In addition, the lack of adequate training for operators also plays a role in worsening molding quality. The improvement plan implemented includes the use of monitoring sensors such as the Internet of Things with the Kaizen approach.