Putranti, Indah Puspitaning Tyas
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

QUALITY CONTROL DUE TO DAMAGED RETURNED GOODS AT THE CHANGHONG WAREHOUSE Putranti, Indah Puspitaning Tyas; Luluk Fauziah
Journal of Economic and Economic Policy Vol. 2 No. 4 (2025): Journal of Economics and Economic Policy
Publisher : PT ANTIS INTERNATIONAL PUBLISHER

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61796/ijecep.v2i4.79

Abstract

Objective: This research aims to describe quality control related to damage in returned goods, identify quality control implementation using the PDCA (Plan-Do-Check-Act) method. Method: To address these issues, the company implemented strategies such as fishbone diagram analysis and the 5 Why analysis, and developed a Work Instruction (WI) as a standard operating guideline to support comprehensive quality control improvements. Results: The results of the study indicate that the primary causes of damage to returned goods include improper use of hand pallets and an overloaded warehouse, leading to limited and inaccessible storage space. In addition, ineffective communication also contributes to the high number of returned goods. Novelty: The company has obtained ISO 9001 certification, which focuses on quality management systems, as evidence of its commitment to implementing quality control standards. However, in practice, the quality control implementation at this company has not been optimal. This is evident from the high rate of damage in returned goods, which exceeds the annual target limit of 90 cartons out of the total returned items received.
QUALITY CONTROL DUE TO DAMAGED RETURNED GOODS AT THE CHANGHONG WAREHOUSE Putranti, Indah Puspitaning Tyas; Luluk Fauziah
Journal of Economic and Economic Policy Vol. 2 No. 4 (2025): Journal of Economics and Economic Policy
Publisher : PT. Antis International Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61796/ijecep.v2i4.79

Abstract

Objective: This research aims to describe quality control related to damage in returned goods, identify quality control implementation using the PDCA (Plan-Do-Check-Act) method. Method: To address these issues, the company implemented strategies such as fishbone diagram analysis and the 5 Why analysis, and developed a Work Instruction (WI) as a standard operating guideline to support comprehensive quality control improvements. Results: The results of the study indicate that the primary causes of damage to returned goods include improper use of hand pallets and an overloaded warehouse, leading to limited and inaccessible storage space. In addition, ineffective communication also contributes to the high number of returned goods. Novelty: The company has obtained ISO 9001 certification, which focuses on quality management systems, as evidence of its commitment to implementing quality control standards. However, in practice, the quality control implementation at this company has not been optimal. This is evident from the high rate of damage in returned goods, which exceeds the annual target limit of 90 cartons out of the total returned items received.