This Author published in this journals
All Journal PROMINE
Huby, Gidion Salek Wikirue
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Evaluasi Sinkronisasi Kerja Alat Muat Dan Alat Angkut Pada PT Modern Widyatehnical Kampung Wiraskadistrik Wanggar Kabupaten Nabire-Papua Tengah Huby, Gidion Salek Wikirue; Doirebo, Hans Yohanes Elrix
PROMINE Vol 13 No 1 (2025): PROMINE
Publisher : Program Studi Teknik Pertambangan, Fakultas Sains dan Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/jp.v13i1.6115

Abstract

PT Modern Widya Tehnical is a construction company in the mining sector engaged in material transportation materials from industrial excavation materials. Mechanical tools in the form of digging tools and transport tools on the reservoir. The current problem shows that the CAT 320 D excavator excavator often waits for the Mithsubishi HD125 PS dump truck to be loaded. The research method was carried out by observing the history of excavating equipment and transportation equipment that were operated and adjusted to the production target. The results of the study obtained the need to add 1 unit of Mitsubishi HD 125 PS dump truck transport equipment so that the efficiency of loading equipment increased from 72.86% to 84%, the difference in increasing the efficiency of loading equipment to 11.14%. This also had an impact on increasing the production of loading equipment by 11.63 m3/hour from 69.75 to 81.38 m3/hour.