Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Faktor yang Menyebabkan Downtime pada Mesin Injector Freon di Divisi Refrigerator PT. XYZ Achmad Azis Rahmanto; Rifki Irfani; Lazuardi Allan Suryawan
Jurnal Engine: Energi, Manufaktur, dan Material Vol. 9 No. 1 (2025)
Publisher : Proklamasi 45 University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30588/jeemm.v9i1.2162

Abstract

The freon injector machine is a crucial component in the production line at PT. XYZ, responsible for refrigerant injection. However, frequent downtime disrupts production efficiency. This study aims to analyze the factors causing downtime in the freon injector machine at PT. XYZ, focusing on Coupler component failures. Using the PDCA method and fishbone diagram analysis, the primary causes were identified across human, method, machine, and material factors. Installation and removal errors contributed to human-related issues, while the absence of preventive maintenance resulted in reactive component replacement. Machine-related factors included component wear and latch failure, whereas material-related issues stemmed from a lack of understanding of load limits, leading to faster wear. The SMART method was used to validate corrective measures. Implementing better maintenance strategies, including scheduled preventive maintenance and increased technician awareness, is expected to significantly reduce downtime and enhance production efficiency.