Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perencanaan Penggunaan Electrical Submersible Pump Pada Sumur “AM” Anastasyah Maulidiah; Engeline Malrin; Mirza; Yudiaryono; Esterina Natalia Paindan; Agista Ayu Ramadhani; Pratama Bagus Restu.S
AL-MIKRAJ Jurnal Studi Islam dan Humaniora Vol. 3 No. 1 (2022): Al-Mikraj, Jurnal Studi Islam dan Humaniora
Publisher : Pascasarjana Institut Agama Islam Sunan Giri Ponorogo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37680/almikraj.v3i1.7157

Abstract

"AM" wells are wells that no longer have the ability to produce fluid on their own. So it requires the utilization of artificial lift. The artificial lift process it self aims to increase fluid pressure so that it can flow to the surface. The production process for this well has been carried out by natural flow with a production of 593 BFPD. After several years of production, the reservoir pressure will decrease and the ability to lift the fluid will also decrease. If the pressure drop experienced by the reservoir is very large, the reservoir can no longer produce oil to the surface. But referring to the capability of the well, the production of this well can still be increased by using an Electric Submersible Pump (ESP) type artificial lift. Based on the desin method carried out is to plan the design of the artificial lift Electric SubmersibIe Pump (ESP) using manual calculations.
Upaya Peramalan Cadangan Minyak Pada Sumur SBR-A Menggunakan Metode Decline Curve Analysis Sakinah; Firdaus; Joko Wiyono; Yudiaryono; Abdul Gafara Karim; Aliyah Sayyidina Putri Bahtiar; Darmiyati, Iin
AL-MIKRAJ Jurnal Studi Islam dan Humaniora Vol. 3 No. 2 (2023): Al-Mikraj, Jurnal Studi Islam dan Humaniora
Publisher : Pascasarjana Institut Agama Islam Sunan Giri Ponorogo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37680/almikraj.v3i2.7160

Abstract

Oil and natural gas are needs that are needed by every country including Indonesia. national need. In the SBR-A well field R, this was used for final project research, namely estimating oil reserves using the decline curve analysis method, the SBR-A well experienced a decrease in production. The purpose of carrying out the decline curve analysis method is to estimate or predict the estimated ultimate recovery and oil production in the future, so that we can predict the future production prospects of the field under study, so that we can determine the best steps taken to develop the field. either in actual conditions or other conditions. Based on the research results obtained from data processing using the Decline Curve Method, it can be seen that the type of curve is Exponential decline, with an actual cumulative value of 51328.40203 STB and a decline exponential value (b) of 0.01 and a nominal value of decline (D) of 0.007. And the remaining oil reserves (ERR) up to the economic limit of 53865.62128 STB, so that the SBR-A well can produce up to the economic limit of 5 BOPD, which is 674 days or 1.9 years, which starts production from 8 May 2023 to 1 January 2025. With the value of the amount of reserves that can be produced (EUR) in the SBR-A Well, which is 105194,023 STB..