Evaluasi Produktivitas Angkat Baja pada Bangunan Pabrik Kelapa Sawit Silitonga, Desmon; Mardiaman, Mardiaman; Indriasari, Indriasari
Jurnal Talenta Sipil Vol 8, No 2 (2025): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i2.957

Abstract

The growth of the industrial sector in Indonesia has driven the widespread use of steel structures due to their advantages in strength, construction speed, and cost efficiency. One significant application is in the construction of palm oil mills (PKS), which often face challenging site conditions requiring effective erection planning. However, steel structure erection productivity in PKS projects is frequently hindered by inappropriate work methods and unsystematic time recording. Significant variations in productivity across structural elements and the lack of comparative studies between crane and manual methods create a research gap that needs to be addressed. This study aims to evaluate and compare the productivity of steel structure erection in the Mill Building of a PKS project using crane and manual methods. A quantitative case study approach was applied at PT. Tunggal Yunus Estate, Tapung, Riau, with primary data collected through field observations, interviews, and project documentation. Productivity (kg/hour) was calculated based on the weight and installation duration of each structural element. The results show an average erection productivity of 480.98 kg/hour, with the highest productivity reaching 955.44 kg/hour for main columns and rafters using a crane. In contrast, manual methods for secondary elements such as wind bracing and canopy yielded the lowest productivity at 156.78 kg/hour. These findings confirm that crane methods are more effective for main structural elements, while the use of manual methods should be carefully adapted to site conditions to maintain time-cost efficiency.
Menentukan Biaya Dan Waktu Pelaksanaan Erection Konstruksi Baja Mill Building Pabrik Kelapa Sawit Silitonga, Desmon; Mardiaman, Mardiaman
Syntax Literate Jurnal Ilmiah Indonesia
Publisher : Syntax Corporation

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/syntax-literate.v10i6.59942

Abstract

This research aims to assess the costs and duration associated with the erection of steel structures in the Mill Building of PT. Tunggal Yunus Estate Palm Oil Mill, located in Kampar, Riau. The palm oil sector plays a significant role in Indonesia's economy, making the presence of Palm Oil Mills (PKS) essential for palm oil production. Utilizing a quantitative methodology with a case study approach, the study analyzes work volume, equipment and labor productivity, as well as cost and time estimations. Results reveal that the erection period for the steel structure is 40 calendar days, which corresponds with the actual time recorded on-site. The overall cost of erection is IDR 276,075,000.00, resulting in a unit cost of IDR 1,854/kg. Various factors affecting costs and duration include weather conditions, the challenging muddy terrain of the project site, and the coordination among work teams. This study offers valuable insights for the planning and budgeting of future steel construction projects within the palm oil industry.