Rasit, Muhammat Nur
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Beban Kerja Karyawan di Departemen Produksi Menggunakan Metode Full Time Equivalent (FTE) PT. KLM Rasit, Muhammat Nur; Hidayati, Roziana Ainul
Management Studies and Entrepreneurship Journal (MSEJ) Vol. 6 No. 6 (2025): Management Studies and Entrepreneurship Journal (MSEJ)
Publisher : Yayasan Pendidikan Riset dan Pengembangan Intelektual (YRPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37385/msej.v6i6.8689

Abstract

This study aims to analyze the workload level of employees in the production department of PT. KLM using the Full-Time Equivalent (FTE) method. This method is used to determine the optimal number of workers required to complete a task by considering the total workload and available working time. The results of the analysis show that operators in painting, finishing, sandblasting, PPIC (Production Planning and Inventory Control), and Quality Control are categorized as optimal or have a normal workload. However, welding operators face a shortage of staff, resulting in an underload workload condition, while cutting operators experience an excessive workload with surplus labor. Additionally, the Health, Safety, and Environment (HSE) staff also show an underload workload level