p-Index From 2021 - 2026
0.444
P-Index
This Author published in this journals
All Journal Jurnal Talenta Sipil
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Penilaian Kinerja dan Angka Kebutuhan Nyata Operasi dan Pemeliharaan (AKNOP) Sungai Pecangaan di Kabupaten Jepara P.P, Pipit Skriptianata; Muhammad, Nicko Fadhil
Jurnal Talenta Sipil Vol 8, No 2 (2025): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v8i2.965

Abstract

Rivers are one of the water sources that are very important for human survival. The decline in the function of river facilities and infrastructure has a significant impact on the lack of fulfillment of the need for raw water and control of the destructive power of water. Therefore, it is necessary to handle the maintenance of river facilities and infrastructure so that they can function properly, namely by conducting surveys and inventories of river facilities and infrastructure and immediately addressing the causes of the decline in the function of river facilities and infrastructure that occur. The main objective is to determine the physical condition and function of the performance assessment of river facilities and infrastructure and to obtain the ROMNF (Real Operation and Maintenance Needs Figures) needed in the OM (Operation and Maintenance) activities of a river in the future. In preparing the performance assessment and ROMNF of the river, it refers to Guidelines for Organizing Operation and Maintenance Activities for Facilities and River Maintenance, namely Circular Letter of the Director General of Water Resources No. 05/SE/D/2016. The results of the study showed that the Pecangaan River, which is 18,380 km long, has a performance assessment result of 87.97% with recommendations for preventive maintenance. Meanwhile, ROMNF 's requirement for the Pecangaan River in Jepara Regency is IDR 10,342,578,256.00.
Perhitungan Kapasitas Kolam Retensi Rumah Susun Dosen Politeknik PU Muhammad, Nicko Fadhil; Trihartati, Aprillya; P.P, Pipit Skriptianata
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1227

Abstract

Water conservation utilizing rainwater is very effective and efficient both in the rainy season and in the dry season. The construction of this lecturer housing must be supported by a good drainage system so as not to increase the burden of water runoff to the surrounding area. Problems that can be formulated include: what is the flood discharge of the return period Q2, Q5 and Q10 before and after the construction of the Rusun Dosen Polythecnic PU, how long can the retention pond and other water structures accommodate the flood discharge in the area, what alternatives can be implemented if the capacity of the retention pond and other structures cannot accommodate the flood discharge in the area. The purpose of this study is to analyze the flood discharge of the return period Q2, Q5 and Q10 before and after the construction. Analyze water structures that can accommodate flood discharge. Analyze alternatives that can be applied. The methodology used is data collection, data analysis (maximum rainfall, rainfall distribution, flood discharge) and calculation of the capacity of water structures. The conclusions obtained are: the potential flood discharge of existing conditions is 0.119 m3/sec, the potential flood discharge after the construction is 0.303 m3/sec, there is an increase in flood discharge of 0.184 m3/sec, the capacity of water structures: retention ponds can accommodate flood discharge of 1,408.53 m3, RWT can accommodate flood discharge of 92.4 m3, infiltration wells can accommodate flood discharge of 25.12 m3, drainage channels can accommodate flood discharge of 143.2 m3. The total capacity of the retention pond and other water structures will be full if it rains for 2.52 hours. This does not meet SNI 03-3424-1994 standards. The recommendation is to enlarge the channel dimensions