Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Pengendalian Mutu Pekerjaan Timbunan Random Batu pada Proyek Pembangunan Bendungan Way Apu Batista, Erwin; Handayani , Anjas
Jurnal Impresi Indonesia Vol. 4 No. 8 (2025): Indonesian Impression Journal (JII)
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/jii.v4i8.6964

Abstract

Dam is a structure consisting of earth, rock, and concrete embankments built to retain and contain water. Dam embankment work is generally carried out with the longest schedule during each dry season. The Way Apu Dam Construction Project experienced flooding due to the overflow of the Way Teba river exceeding the cofferdam on July 5, 2024, which could potentially reduce the quality of random rock embankment work. This study aims to analyze the factors that influence quality control of random rock embankment work using quantitative descriptive methods through statistical analysis with SPSS software. Data was collected through questionnaires to 44 respondents involved in the project. Factors influencing quality control were determined by multiple linear regression tests using the stepwise method. The results showed that there are 4 significant variables: "Worker Awareness in Quality Assurance and Control", "Documentation of Monitoring and Measurement Results at Each Stage of Work", "Documentation of Material Loading Checked by Field Director/Consultant", "Report on Hazard Identification, Risk Assessment, Control and Opportunities for Construction Safety" with F_count value = 34.334. The most dominant variable is "Worker Awareness in Quality Assurance and Control" based on T_count value = 8.929.