Cost Analysis of Construction Cost Planning for Landfill Site Junaedi, Nurhayati; Bayuaji, Ridho; Susilo, Alfred Jonathan
Engineering, MAthematics and Computer Science Journal (EMACS) Vol. 7 No. 3 (2025): EMACS
Publisher : Bina Nusantara University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21512/emacsjournal.v7i3.13800

Abstract

Accurate construction cost planning is essential to ensure project success, as inaccurate estimates may lead to delays, cost overruns, and reduced quality. Landfill construction, which is more complex than many other infrastructure projects, includes several components such as landfill work, leachate treatment facilities, and supporting infrastructure. The purpose of this study is to determine the major cost factors that have a major impact on the overall cost of building landfill sites.  With the aid of SPSS software, a regression analysis was carried out using cost data from six landfill projects in Java Island that were completed between 2013 and 2018.  With a Sig value of 0.000 (<0.05) and a very strong correlation (Pearson Correlation 0.991, within the 0.8–1.0 interval), the results show that landfill work (X3) significantly affects total costs (Y).  Leachate treatment facilities (X4) are another crucial element in a number of situations, but landfill work (X3) consistently represents the largest portion of construction costs, according to proportion analysis. These results demonstrate the growing significance of environmental facilities and point to landfill work as the main factor influencing landfill construction costs.  The study offers contractors and federal and local governments useful information for creating more precise cost estimates, maximizing budgetary allotments, and enhancing planning and development efficiency for landfill projects.
Development of A Parametric Cost Estimation Model for Landfill Construction Projects Junaedi, Nurhayati; Bayuaji, Ridho; Susilo, Alfred Jonathan
Advance Sustainable Science Engineering and Technology Vol. 7 No. 4 (2025): August-October
Publisher : Science and Technology Research Centre Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/asset.v7i4.2424

Abstract

Indonesia’s waste management system is still dominated by the collect–transport–dispose approach, making landfills crucial for environmental sustainability. Landfill construction is a complex process requiring accurate cost estimation to prevent overruns and delays. This study develops a landfill construction cost estimation model using the Cost Significant Model (CSM) approach. Data were obtained from landfill project budgets in Java, Indonesia (2013–2021) and analyzed using multiple linear regression in SPSS. Results show that landfill block, leachate treatment installation, and operational road are the most significant cost components, the estimation model is Y = 3698103502.04 + 1.301X3 + 0.371X4 + 1.236X5. The model falls within the class 4 cost estimation accuracy range according to AACE International standards, making it suitable for feasibility study use. This study introduces a model, context-specific cost estimation model for landfill projects in Indonesia, supporting effective planning and sustainable infrastructure development