Claim Missing Document
Check
Articles

Found 2 Documents
Search

IMPLEMENTASI SISTEM PLTS HYBRID PLN SEBAGAI SUMBER ENERGI PADA PENGERING BIJI KOPI SOLAR DRYER DOME Rozak, Ojak ABdul; Astuti, Rini; Muallim, Edwar; Rhomadon, Ahmad Arif Falah
Jurnal Informatika dan Teknik Elektro Terapan Vol. 13 No. 3S1 (2025)
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jitet.v13i3S1.7667

Abstract

Implementation of the design of a hybrid solar power plant (PLTS) system as the main energy source in drying coffee beans (solar dryer dome). Efficient and sustainable drying of coffee beans is a challenge for many coffee farmers, especially in remote areas with limited access to conventional energy sources. With a hybrid solar power system, it is hoped that environmentally friendly and cost-effective solutions can be created with electrical energy. This hybrid solar power plant combines solar technology with PLN energy sources or batteries as a storage medium for electrical energy. The solar dryer dome is a special greenhouse for the coffee bean drying process, allowing optimal microclimate control, so that the coffee bean drying process can run faster and more evenly without depending on weather conditions. The planning, design, assembly, commissioning, implementation, testing, and analysis process has been well done from start to finish. The Hybrid Solar Power System can supply batteries for charging for 4 hours with a sunlight intensity of 415 lux and a maximum temperature of 50.5°C. The battery can be used discharging for 1.5 hours with a load of 0.5 amperes with a voltage drop of 0.01 volts. With this Hybrid Solar Power Plant, the solar dryer dome system can be supplied with energy continuously according to its operational needs.
IMPLEMENTASI SISTEM KENDALI PENERANGAN BERSUMBER ENERGI PHOTOVOLTAIK DI DARUL AYTAM AL-MUSTAFA GUNUNG SINDUR BOGOR Astuti, Rini; Muallim, Edwar; Rozak, Ojak Abdul
Jurnal Gembira: Pengabdian Kepada Masyarakat Vol 3 No 06 (2025): DESEMBER 2025
Publisher : Media Inovasi Pendidikan dan Publikasi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Instalasi kelistrikan tidak tertata dengan baik beresiko kebakaran akibat korsleting dan menyebabkan biaya listrik mahal. Masalah ini berdampak terhadap keamanan dan keberlangsungan operasional. PkM ini bertujuan untuk menambah sumber energi alternatif bersumber photovoltaik dilengkapi pewaktu pada penerangan lapangan dalam meningkatkan kenyamanan kegiatan santri. Diterapkan metode analisis kebutuhan, pemilihan bahan standar, pemasangan instalasi, pengujian dan evaluasi dengan melibatkan santri. Hasil menunjukkan peningkatan signifikan dalam aspek tata kelola instalasi dan mengurangi risiko kebakaran akibat korsleting. Partisipasi santri menjadi faktor kunci keberhasilan yang menciptakan rasa memiliki dan kesadaran akan pentingnya keamanan instalasi listrik. Selanjutnya diperlukan pemeliharaan rutin instalasi dan edukasi berkala. Kegiatan ini menunjukkan kontribusi nyata dalam pemberdayaan masyarakat melalui pendekatan inovatif dan berkelanjutan.