Bahtiar, Farhan Rafid
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Quantity Take-off Using Building Information Modeling on Superstructure Works Bahtiar, Farhan Rafid; Nurasiyah, Siti; Istiqomah, Istiqomah
Portal: Jurnal Teknik Sipil Vol 17, No 2 (2025): October Edition
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v17i2.7788

Abstract

Technological advancements in the construction industry have encouraged the adoption of Building Information Modeling (BIM) as a digital approach in project implementation. This study discusses the implementation of BIM in calculating work volumes (Quantity Takeoff/QTO) and project scheduling by considering labor fluctuations through resource leveling analysis. The objective of this research is to compare QTO results between BIM and conventional methods, as well as to analyze labor requirements and project duration. This research uses a case study method on the superstructure phase of a building project. The comparison results show a difference in work volumes between the BIM and conventional methods, namely 8.98% for reinforcement work, 13.23% for concrete casting, and 8.57% for formwork. Based on these findings, this study provides a quantitative overview of the differences between the conventional and BIM-based methods in terms of work volume. Further studies are recommended using more diverse case objects and a broader scope of construction work.