Situmorang, Napoli
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Jurnal Rekayasa Sipil dan Desain

Tinjaun Undang-Undang dan Peraturan Presiden Terhadap Contract Change Order Proyek Perpustakaan Modern Lampung Akibat Rasionalisasi Anggaran Pemilik Proyek Sanjaya, Deddy; Kustiani, Ika; Siregar, Amril Maruf; Situmorang, Napoli
Jurnal Rekayasa Sipil dan Desain Vol. 8 No. 3 (2020): Edisi September 2020
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v8i3.1437

Abstract

The Library Building is one of the Infrastructure that provides various sources of information to improve the intelligence of human resources in a region. This research focuses on the analysis of statutory regulations and the scope of work, costs, time and quality. The focus of the research is the process of analyzing the justification for changes in the volume of work after the rationalization of the budget is reviewed based on Law No. 2/17 concerning Construction Services and Presidential Regulation of the Republic of Indonesia No. 2/18 concerning Government Procurement of Goods / Services. The result of this analysis is that the Construction Work Contract Article 47 paragraph 1 letter b is the regulation rules of the  UUJK which are used as a reference as budget rationalization and work changes are allowed and regulated in Presidential Regulation article 54. This Contract Change Order has a significant volume increase in structural work, due to The lack of accuracy in calculating the initial planning consultant and there are seven specifications for changes in architecture work items façade. The result of this budget rationalization was also a change in the budget for the construction of the Modern Library of Lampung Province from Rp62,384,405,000.00 to Rp55,746,000,000.00 and there was no additional time for completion of work. This project does not cause a dispute because both parties have agreed to change the volume and work items.