Meriana Wahyu Nugroho
Program Studi Teknik Sipil, Universitas Hasyim Asy’ari, Jombang

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Evaluasi Kekuatan Abutment Terhadap Daya Dukung Tanah Pada Jembatan Dengan Metode Terzaghi Wisnu Fahlevi Dian Siswanto Wisnu; Meriana Wahyu Nugroho; Titin Sundari; Totok Yulianto
MEDIA KONSTRUKSI Vol. 10 No. 1 (2025)
Publisher : Jurusan Teknik Sipil, Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/jmk.v10i1.91

Abstract

Jembatan Klagen merupakan jalan penghubung desa yang mengalami peningkatan terhadap jumlah penduduk, perekonomian, dan potensi daerah yang cukup baik. Permukaan tanah serta kondisi tanah lunak yang sangat rawan akan bahaya kelongsoran dimana abutment jembatan tersebut mengalami penurunan. Tujuan dari penelitian ini adalah untuk mengevaluasi stabilitas abutment jembatan dalam menopang beban-beban yang bekerja terhadap gaya geser (FSsliding) dengan menggunakan metode terzaghi, karena selama ini belum pernah dilakukan. Hasil analisis perhitungan adalah stabilitas abutment jembatan dalam gaya geser (FSSliding) dalam perhitungan manual, didapatkan nilai (SF) sebesar kombinasi 1 = 2,12, kombinasi 2 = 2,00, kombinasi 3 = 2,10, kombinasi 4 = 2,20. Pada hasil analisis software didapatkan nilai (SF) sebesar 3,82. Dari kedua perhitungan gaya geser ini aman, karena angka faktor keamanan (SF) diambang batas izin yaitu >1,5.
Perbandingan Efektivitas Penjadwalan Terhadap Biaya Metode LoB (Line of Balance) dan Gantt Chart Pada Proyek Pekerjaan Jalan Denanyar - Sendangrejo Wahyu Bagas Maulana; Totok Yulianto; Meriana Wahyu Nugroho; A’izzatul Khiyana
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 14 No 2 (2026): Jurnal Konstruksi dan Infrastruktur Vol 14 No.2 : October 2026
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v14i2.12406

Abstract

The success of a construction project is highly influenced by the accuracy of scheduling and the suitability of cost planning. To prevent project delays and cost overruns, a rescheduling analysis was conducted on the Denanyar–Sendangrejo Road Construction Project using the Gantt Chart and Line of Balance (LoB) methods. This study aims to analyze and determine the effectiveness of project duration in relation to project costs. The analysis was carried out through the calculation of labor-hour requirements, workforce grouping, determination of activity start times, and buffer time allocation. The results indicate that the Line of Balance (LoB) method produces a shorter project duration, requiring only 58 days compared to 77 days using the Gantt Chart method, with an effectiveness value of 24.68%. In terms of cost, the LoB method results in a project cost of IDR 485,430,365.41, which is 0.82% more efficient than the Gantt Chart method, with a cost of IDR 489,430,383.41. Therefore, the Line of Balance (LoB) method is proven to be more effective in reducing project duration and more efficient in minimizing project implementation costs.