This Author published in this journals
All Journal IIJSE
Raihan Rahmadianto
Universitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Lean Manufacturing Analysis with Waste Assessment Model (WAM) Approach to Reduce Critical Waste in the Production Process of Woven Sarong CV. XYZ Raihan Rahmadianto; Joumil Aidil Saifuddin
Indonesian Interdisciplinary Journal of Sharia Economics (IIJSE) Vol 8 No 2 (2025): Sharia Economics
Publisher : Universitas KH. Abdul Chalim Mojokerto

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31538/iijse.v8i2.6339

Abstract

The manufacturing industry faces challenges to improve efficiency and productivity amid increasingly fierce global competition. This study aims to analyze waste in the sarong weaving production process at CV. XYZ is using the Lean Manufacturing approach with the Waste Assessment Model (WAM) method. The results showed that the two most critical types of waste were transportation (20.95%) and inventory (20.64%). The root causes of transportation waste include inefficient fabric movement and narrow transportation lanes, while inventory waste is caused by the accumulation of goods in process (WIP) and the policy of purchasing raw materials in large quantities. The proposed improvements include layout optimization, efficient means of transportation, inventory management training, and line balancing implementation. The recommendations are projected to reduce production lead time by 13.60%, from 1,265 minutes to 1,093 minutes. This research makes a significant contribution to the application of Lean Manufacturing in the traditional textile industry.