p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Hexagon
Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERBANDINGAN PERHITUNGAN PERPINDAHAN PANAS PADA PERISAI DENGAN MENGGUNAKAN METODE ELEMEN HINGGA DAN METODE SELISIH HINGGA Zainuddin Husainy; Dinda Fardilla
Hexagon Vol 6 No 1 (2025): HEXAGON - Edisi 11
Publisher : Fakultas Teknologi Lingkungan dan Mineral - Universitas Teknologi Sumbawa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36761/hexagon.v6i1.5747

Abstract

The presented journal concerns calculations of heat transfer in a shield with use of two methods: finite element method and finite difference method. The comparison of heat transfer calculation of the selected problem is performed for a rectangular isotropic shield with the dimensions of 6 m x 4 m, with a rectangular hole with the dimensions of 2 m x 1 m. The shield was divided into 0.25 m x 0.25 m rectangular elements and 0.25 m x 0.25 m triangular elements for calculations in the finite element method and 0.25 m x 0.25 m rectangular elements for calculation in the finite difference method. The rectangular finite element model has 404 nodes, 352 elements, while the triangular finite element model has 404 nodes, 704 elements; the finite difference model has 445 nodes. Heat conductivity coefficients for the shield are 1.2 W·m–1·K–1 in both x and y directions. Prescribed boundary conditions are: top edge temperature 43 °C, bottom edge temperature 3 °C, left edge convection heat transfer coefficient a = 2.3 W·m–2 and ambient temperature Ta = 47 °C, right edge radiation heat flux density q = 3.8 W·m–2, 4 insulated hole edges. The shield has 2 point heat discharges: 5 W located in the point with coordinates (0.5 m, 0.5 m) and 11 W located in the point with coordinates (5.0 m, 1.0 m). The shield thickness is 1 m. The results of calculations are presented in 3 graphs in the form of contour maps. The comparison shows that the results given by the finite element method with use of the rectangular finite elements and triangular finite elements as well as by the finite difference method are similar which allows to conclude that the calculation results are trustworthy and have been done correctly. It is also confirmed by the energetic balance performed for the finite element method.
PERBANDINGAN EFEKTIFITAS METODE KONVENSIONAL DENGAN BUILDING INFORMATION MODELING (BIM) PADA PERHITUNGAN BIAYA PELAKSANAAN PROYEK KONSTRUKSI Dinda Fardila; Ilham Bintang Adhitama; Miftahuljannah; Muhammad A’zamul Amar; Zainuddin Husainy
Hexagon Vol 6 No 2 (2025): Vol. 6 No. 2 (2025): HEXAGON - Edisi 12
Publisher : Fakultas Teknologi Lingkungan dan Mineral - Universitas Teknologi Sumbawa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36761/hexagon.v6i2.6393

Abstract

Perkembangan industri konstruksi yang pesat dan kompleksitas proyek yang semakin tinggi menuntut adanya metode perencanaan yang lebih efektif, efisien, dan terintegrasi. Building Information Modeling (BIM) hadir sebagai solusi teknologi yang mampu mengintegrasikan proses desain dan konstruksi secara digital, sehingga menghasilkan informasi yang lebih akurat. Penelitian ini bertujuan untuk membandingkan volume pekerjaan dan estimasi biaya pelaksanaan proyek konstruksi Gedung Rektorat Universitas Teknologi Sumbawa menggunakan metode konvensional dan metode BIM. Penelitian ini menggunakan pendekatan komparatif dengan memanfaatkan perangkat lunak Autodesk Revit sebagai instrumen pemodelan 3D. Estimasi biaya dilakukan berdasarkan Analisis Harga Satuan Pekerjaan (AHSP) Kabupaten Sumbawa tahun 2012. Hasil perhitungan menunjukkan bahwa terdapat selisih biaya sebesar Rp 80.656.000 atau sekitar 4,8%, di mana metode BIM memberikan estimasi yang lebih rendah dibandingkan metode konvensional. Selisih ini mencerminkan keunggulan BIM dalam akurasi perhitungan volume dan efisiensi material karena didukung oleh visualisasi tiga dimensi serta deteksi dini terhadap konflik desain. Dengan demikian, dapat disimpulkan bahwa BIM lebih unggul dalam menunjang perencanaan biaya proyek dan dapat diandalkan sebagai pendekatan modern dalam manajemen konstruksi.