Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perencanaan Penggantian dan Perbaikan Komponen Penggiling Kopi Kapasitas 2 kg/Jam Periode 2026 Widdi Haddiq Firmansyah; Syamsul Hadi; Rikhy Sambora; Zidhan Muhammad Akbar; Mochammad Dimas Awalludin
Venus: Jurnal Publikasi Rumpun Ilmu TeknikĀ  Vol. 3 No. 6 (2025): Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v3i6.1256

Abstract

Unexpected downtime of a 2 kg/hour coffee grinder is crucial in cafe operations, thus less guaranteeing the availability of the grinder. The purpose of component replacement and repair planning is to obtain a prediction of the maintenance and repair schedule and costs in the 2026 period. The component replacement planning method includes collecting previous maintenance and repair data, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, predicting component life, predicting technician costs, predicting supporting work equipment and supporting materials to be used in maintenance, predicting the time to replace spare parts or reinstall components after repair, estimating maintenance and repair costs for the 2026 period, and calculating the ratio of maintenance costs to profits. The results of component replacement and repair planning obtained maintenance costs for the 2026 period are IDR 2,350,000, - with an estimated coffee grinder rental rate of IDR 25,000/hour which has the potential to be rented for 1440 hours/year, and the ratio of maintenance costs to profits is 6.5% which implies that the coffee grinder with a capacity of 2 kg / hour is still suitable for use for the next few years and still has the opportunity to make a profit.