Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Perencanaan Mutasi Trafo pada Gardu CMY dengan Metode Least Square untuk Keandalan Sistem Distribusi di PT PLN (Persero) ULP Labuan Dhita Safira Putri; Siti Anisah; Adi Sastra P Tarigan
JURAL RISET RUMPUN ILMU TEKNIK Vol. 5 No. 1 (2026): April: Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v5i1.7547

Abstract

Distribution transformers play a crucial role in delivering electrical energy from the distribution system to consumers to ensure power quality and supply continuity. However, in practice, overload conditions often occur due to increasing demand and load growth that exceed the transformer’s rated capacity. This situation can lead to reduced efficiency, increased power losses, and accelerated equipment aging. This study aims to analyze the performance of the CMY distribution transformer at PT PLN (Persero) ULP Labuan, which operates beyond its nominal capacity, and to propose an alternative solution through transformer mutation, namely the replacement of the existing unit with a transformer of more appropriate capacity based on load analysis results. The Least Square Method is employed to predict future load growth and determine the projected time when the transformer will again experience overload after the mutation. The results indicate that the existing 100 kVA transformer is overloaded and should be replaced with a 160 kVA unit. After the mutation, the loading percentage decreases significantly, the transformer’s lifespan is extended, and the reliability of the distribution system improves. Furthermore, the Least Square prediction suggests that the new transformer may experience overload again in future years if no further planning is carried out. Therefore, transformer mutation can be considered an effective and medium-term solution to enhance and maintain the reliability of the electrical distribution system within the operational area of PT PLN (Persero) ULP Labuan.