Anas Ma'ruf
Bandung Institute of Technology

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Fixture Planning for Multi-Workpiece Setup for Make-to-Order Industry Anas Ma'ruf; Edwin Syalli Siregar
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri Vol. 26 No. 1 (2024): June 2024
Publisher : Institute of Research and Community Outreach - Petra Christian University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.9744/jti.26.1.1-8

Abstract

An alternative method to reduce setup time is to simultaneously carry out fixture planning for several parts in one setup planning. This is possible due to the size of parts which are relatively small to the size of the machine work bed, typically found in a make-to-order industry. This research proposed a fixture planning method for multi-workpiece setup. The fixture planning method comprised two stages: 1) multi-workpiece layout and 2) 3-2-1 pin location. An example of multiple workpiece setup is illustrated in this paper to point out the method's applicability. Future research activity will integrate the proposed collaborative human-robot assembly design system method.