PENERAPAN WORK BREAKDOWN STRUCTURE PADA PREVENTIVE MAINTENANCE TOTAL FIRE SYSTEM (PMTFS) UNTUK MENINGKATKAN KEANDALAN BANGUNAN GEDUNG Arnolth Purba; Rossy Armyn Machfudiyanto
Jurnal Infrastruktur Vol. 11 No. 1 (2025): Jurnal Infrastruktur
Publisher : Jurnal Infrastruktur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/tx362670

Abstract

This study examines the implementation of a Work Breakdown Structure (WBS) in the preventive maintenance of the Total Fire System (TFS) to enhance building safety and reliability. Poor maintenance practices can compromise these aspects, increasing fire risks due to inadequately maintained fire protection systems. Utilizing WBS, the study breaks down maintenance tasks into manageable components, improving clarity and effectiveness in planning, execution, and documentation. The hierarchical WBS framework, validated through expert feedback via the Delphi method, was applied in a case study at the Faculty of Computer Science building at the University of Indonesia. The case study demonstrated significant improvements in operational efficiency and compliance with fire safety regulations. WBS enhances task clarity, allows effective scheduling of maintenance activities, and establishes a reliable documentation system. Key benefits of WBS include optimized resource use, cost savings, improved team collaboration, and extended lifespan of fire safety systems. To implement WBS effectively, the study recommends comprehensive training for maintenance teams, fostering collaboration among stakeholders, and adopting continuous improvement practices. In conclusion, this study illustrates that WBS significantly enhances TFS maintenance effectiveness and can be applied across various building types, promoting structured and efficient maintenance practices to improve safety and reliability.  
Identifikasi Risiko Keselamatan Konstruksi pada Pekerjaan Jaringan Irigasi Berbasis Work Breakdown Structure (WBS) untuk Meningkatkan Kinerja Keselamatan Konstruksi Putu Ananta Kusuma Wijaya; Rossy Armyn Machfudiyanto
Jurnal Infrastruktur Vol. 11 No. 1 (2025): Jurnal Infrastruktur
Publisher : Jurnal Infrastruktur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/s7x16v93

Abstract

The construction sector in Indonesia faces a high risk of occupational accidents, particularly in irrigation network projects. This study develops a standardized Work Breakdown Structure (WBS) for irrigation projects to improve safety performance. The WBS standard, detailed into 177 activities across five levels, enables precise identification of safety risks during project planning. Utilizing expert validation through the Delphi Method, 708 risk variables were identified, with 25 dominant risks grouped into three main categories: heavy equipment-related accidents (material lifting failures and traffic collisions) and electric shocks. This framework enhances the implementation of preventive measures and aligns safety management systems with construction activities. Findings reveal that material lifting failures with mobile cranes, traffic-related heavy equipment accidents, and electric shocks are the most significant risks. Integrating WBS-based safety planning during pre-construction improves project safety performance, reduces costs, and enhances sustainability. This research highlights the critical need for comprehensive safety strategies tailored to irrigation projects.