Aondofa Tyozenda
Joseph Sarwuan Tarkaa University Makurdi, NIGERIA

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Digital risk intelligence and supplier failure in African public infrastructure delivery: evidence from Nigeria Aondofa Tyozenda; T. P. J. Jato; S. A. Tyoakosu
Journal of Commerce, Management, and Tourism Studies Vol. 5 No. 1 (2026): April 2026
Publisher : YAYASAN MITRA PERSADA NUSANTARA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58881/jcmts.v5i1.445

Abstract

Digital risk intelligence (DRI) has emerged as a strategic mechanism for mitigating supplier failures in public infrastructure delivery, particularly in African contexts where project delays, cost overruns, and non-compliance remain pervasive. This review critically examines empirical studies from the last nine years to explore how the dimensions of DRI—predictive analytics, real-time monitoring systems, and e-procurement with automated reporting—interact with supplier performance outcomes in Africa, with a particular focus on Nigeria. Findings indicate that predictive analytics enhances foresight in supplier risk assessment, enabling proactive interventions that reduce delays and cost escalations. Real-time monitoring systems facilitate continuous oversight, early detection of deviations, and improved contractual compliance, while e-procurement and automated reporting strengthen transparency, accountability, and governance mechanisms. Comparative analysis across Nigerian case studies, other African countries, and developed economies reveals both opportunities and constraints, highlighting institutional and infrastructural factors that mediate DRI effectiveness. The review further demonstrates theoretical implications for Agency Theory and Dynamic Capabilities Theory by illustrating how DRI reduces information asymmetry and operationalizes sensing, seizing, and transforming capabilities in procurement organizations. Despite growing evidence of DRI’s potential, gaps remain in longitudinal, comparative, and context-specific empirical research. The study concludes by recommending policy reforms, practical adoption strategies, and targeted empirical investigations to optimize DRI deployment and improve supplier performance in African public infrastructure delivery.