Jurnal Teknik Mesin dan Mekatronika (Journal of Mechanical Engineering and Mechatronics)
Vol 3, No 2 (2018): Journal of Mechanical Engineering and Mechatronics

ANALISA PENENTUAN OPEN END PADA PELAKSANAAN SQUEEZE CEMENTING DI ZONA POROUS SUMUR A LAPANGAN B

Rexnord Samuel Simanungkalit (Universitas Trisakti)



Article Info

Publish Date
18 Jan 2019

Abstract

Cementing is the process of pushing a number of slurry which flows from the bottom of the casing shoes to rise to the annulus between the casing and formation. The cement slurry will harden so that it binds between the casing and the borehole wall. According to the purpose of cementing can be divided into two, namely Initial Cementing (Primary Cementing) and Second Cementing or Cementing Repair (Secondary or Remedial Cementing). If the Primary Cementing results are not perfect and have problems, then Secondary or Remedial Cementing will be done. Secondary or Remedial Cementing can be divided into three parts, namely Squeeze cementing, Re-cementing and Plug-back cementing. In this case, the author emphasizes on one of the Secondary or Remedial Cementing namely Squeeze Cementing.

Copyrights © 2018






Journal Info

Abbrev

JMEM

Publisher

Subject

Energy Materials Science & Nanotechnology Mechanical Engineering Transportation

Description

Journal of Mechanical Engineering and Mechatronics merupakan jurnal keilmuan bidang teknik mesin dan mechatronics yang memuat tulisan-tulisan ilmiah mengenai penelitian-penelitian murni dan terapan serta ulasan-ulasan umum tentang perkembangan teori, metode dan ilmu-ilmu terapan ...