Jurnal Penelitian Hasil Hutan
Vol 7, No 4 (1990): Jurnal Penelitian Hasil Hutan

ANALISIS BIAYA DAN TENAGA KERJA PADA BEBERAPA KILANG PENGGERGAJIAN DI SUMATERA SELATAN

Sylviani Sylviani (Pusat Penelitian dan Pengembangan Hasil Hutan)
Akub J Abdurachman (Pusat Penelitian dan Pengembangan Hasil Hutan)



Article Info

Publish Date
21 Aug 2017

Abstract

The result of research on several sawmills in South Sumatera  showed that average   level of manager productivity is 7.563 Cu.m/man/annum, administration productivity is  3.220 Cu.m/man/annum, tecnician productivity is 74 Cu.m/man/annum. Average labor   requirements are 9 men/1.000 Cu.m  of  the  design  capacity  and  10  men/1.000 Cu.m  of  raw material.Cost of  production of  sawntimber   showed  an average  of  Rp  184.808,-/Cu.m, in which  the processing  cost  alone ranked  high  up  to an average of  83 %, marketing  cost 10 %,  and general cost  7 %. Profit  generated of  each  mill per annum  ranged from  Rp 891.060.692,- to Rp  3.165.279.700,- or equivalent   to an average  of  Rp  80.053  per  Cu.m.

Copyrights © 1990