Journals Mining Engineering : Bina Tambang
Vol 4, No 4 (2019): Journals Mining Engineering: Bina Tambang

Analisis Kestabilan Lereng Jalan Tambang di Area Zona 4 PT. Bintang Sumatra Pasifik di Koto Alam Kabupaten 50 Kota

Ahmat Torkis Zudri (Universitas Negeri Padang)
Yoszi Mingsi Anaperta (Universitas Negeri Padang)



Article Info

Publish Date
26 Sep 2024

Abstract

Abstract. The company has not yet carried out a geotechnical plan regarding the stability of the slopes in the mining area. The slope geometry planning will be used by the Bishop Simplified and Janbu Simplified methods. Data clay : Unit Wight (γ) = 19.67 kN / m3, Cohesion (c ') = 30.1 kN / m2 and inner shear angle (ϕ') = 38.06 °. The initial slope height is 11 meters and the overall slope angle is 59°. Recommended slope geometry: 1. The Bishop Simplified method FK saturated conditions of 0.996 unsafe slopes, reduction of slope angles from 59 ° to 46 ° height of 11 meters, FK 1,339 safe slopes. 2. Janbu Simplified Method saturated FK 0.955 unsafe slope condition, slope angle from 59 ° to 44 ° with 11 meters height, then FK 1.34 slope in safe condition.

Copyrights © 2019






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...