Ahmat Torkis Zudri
Universitas Negeri Padang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Kestabilan Lereng Jalan Tambang di Area Zona 4 PT. Bintang Sumatra Pasifik di Koto Alam Kabupaten 50 Kota Ahmat Torkis Zudri; Yoszi Mingsi Anaperta
Journals Mining Engineering : Bina Tambang Vol 4, No 4 (2019): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1122.497 KB) | DOI: 10.24036/bt.v4i4.106873

Abstract

Abstract. The company has not yet carried out a geotechnical plan regarding the stability of the slopes in the mining area. The slope geometry planning will be used by the Bishop Simplified and Janbu Simplified methods. Data clay : Unit Wight (γ) = 19.67 kN / m3, Cohesion (c ') = 30.1 kN / m2 and inner shear angle (ϕ') = 38.06 °. The initial slope height is 11 meters and the overall slope angle is 59°. Recommended slope geometry: 1. The Bishop Simplified method FK saturated conditions of 0.996 unsafe slopes, reduction of slope angles from 59 ° to 46 ° height of 11 meters, FK 1,339 safe slopes. 2. Janbu Simplified Method saturated FK 0.955 unsafe slope condition, slope angle from 59 ° to 44 ° with 11 meters height, then FK 1.34 slope in safe condition.