GEMA TEKNOLOGI
Vol 18, No 1 (2014): April 2014 - October 2014

PEMANFAATAN PMT KOPEL SEBAGAI SARANA PENGALIHAN BEBAN DI GARDU INDUK SAYUNG KABUPATEN DEMAK

Wibowo, Binka Aji (Unknown)
Manan, Saiful (Unknown)



Article Info

Publish Date
01 Oct 2014

Abstract

Binka Aji Wibowo, Saiful Manan, in paper use PMT coupling as load transfer in Sayung District Substation, Demak explain that to meet the reliability of the distribution system , it is necessary to do a continuity in the distribution of electrical energy. There are various causes of outages ranging from maintenance to interference. To resolved these problems, there are several solutions that can be done, such as transfer transformer load through PMT coupling. This can be done by connecting the two busbars by using a PMT. In operation the PMT coupling need to do prior preparation, among others, the daily load calculations. It is intended to carry transformer load does not exceed setting value. Keywords : PMT coupling, Busbar, Transformer.

Copyrights © 2014






Journal Info

Abbrev

gema_teknologi

Publisher

Subject

Computer Science & IT

Description

Gema Teknologi Journal (pISSN : 0852-0232, eISSN : 2656-582X) is an open access journal published by Vocational School, Diponegoro University, Indonesia. Gema Teknologi publishes articles from various engineering disciplines (the results of original scientific research or new scientific studies of ...