Berkala Perikanan Terubuk
Vol 37, No 2 (2009): Juli 2009

ARUS PASANG SURUT SEBAGAI PEMBANGKIT ENERGI LISTRIK DI PERAIRAN MUARA SUNGAI MESJID DUMAI RIAU

Musrifin ' (Unknown)



Article Info

Publish Date
22 Nov 2012

Abstract

Tidal range and tidal current in Sungai Mesjid Estuary have been analyzedin order to find out whether the tidal power in this area could be generated theelectricity. Observations conducted at the end of 2007 and early 2008. Maximumtidal height was 2.8 m and current velocity 0.05 – 0.49 m/s. The tidal type ismixed predominantly semidiurnal tide, flood and ebb tide occur twice a day.Tidal energy conversion (TEC) for low current velocity has been designed.Low tidal current could generated electricity 7.72 Watts and high tidal currentable to generate 78.76 Watts. There was a positive correlation between tidalcurrent velocity and voltages as well as electric power.

Copyrights © 2009






Journal Info

Abbrev

JT

Publisher

Subject

Environmental Science

Description

Berkala Perikanan Terubuk interested in publishing basic, applied and advanced research in the following broad fields but not limited to Fish Biology, Aquaculture, Fisheries Management, Aquaculture, Water Quality, Marine Biology, Marine Pollution, Socio-economic of Fishermen, Aquatic pollution, ...