Civil Engineering Journal
Vol 6, No 3 (2020): March

Delay Factors in Building Construction Project of State Elementary School

Raden Risang Haryo C. D. (Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,)
Lalu Mulyadi (Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,)
Tiong Iskandar (Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,)



Article Info

Publish Date
01 Mar 2020

Abstract

The state elementary school No.027 building construction project in Samarinda Ulu District, Samarinda City, Indonesia, in the 2019 fiscal year, which experienced delays, was allegedly due to the use of inappropriate scheduling methods. Therefore, to overcome these delays, it must use the curtain methods that are appropriate with efficient cost. In this study, we used factor analysis and multiple linear regression methods to measure answers from a questionnaire distributed to 45 respondents like consultants, contractors, and owners who were involved in the state elementary school in above. The results show that the elements that influence the delay in the construction of state elementary school building No.027 Samarinda is a factor in the work scheduling method and construction delay. For Scheduling work get a coefficient value is , and for construction delay method get a coefficient value is . It can be concluded is the most dominant factor construction delay in the State Elementary School No.027 Samarinda in case above is the Work Scheduling Method with a value coefficient is 1.057.

Copyrights © 2020






Journal Info

Abbrev

cej

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Civil Engineering Journal is a multidisciplinary, an open-access, internationally double-blind peer -reviewed journal concerned with all aspects of civil engineering, which include but are not necessarily restricted to: Building Materials and Structures, Coastal and Harbor Engineering, ...