EVALUASI PELAKSANAAN PROYEK BANGUNAN PEMERINTAHDITINJAU DARI SEGI WAKTU PELAKSANAAN DI KABUPATENSLEMAN DIY TAHUN 2011

Bada Haryadi, Imam Muchoyar (Unknown)



Article Info

Publish Date
01 May 2012

Abstract

The aim research are (1) Delay in the implementation of the project; (2) Thebank capital; (3) materials of project; (4) relationship betwen Owner, projectconsultant, and contractor. This research was conducted in Sleman Daerah IstimewaYogyakarta. The sampleof this research is 15 person, with random sampling. Thedata of Analysis using Descriptive of quantitative and percentage. The result aredelay in the implementation of the project, the bank capital were 38.5% and 53.3%respectively. The relationship betwen Owner, project consultant, and contractor werethe result 43,8%. Thats means the relationship is unfavourable.Keyword: project, relationship

Copyrights © 2012






Journal Info

Abbrev

inersia

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

INERSIA is stand for INformasi dan Ekspose hasil Riset Teknik SIpil dan Arsitektur. This scientific journal is managed by the Department of Civil Engineering and Planning Education, Faculty of Engineering, Yogyakarta State University, in cooperation with the Persatuan Insinyur Indonesia (PII). It ...