EVALUASI PELAKSANAAN PROYEK BANGUNAN PEMERINTAHDITINJAU DARI SEGI WAKTU PELAKSANAAN DI KABUPATENSLEMAN DIY TAHUN 2011 Bada Haryadi, Imam Muchoyar
Inersia : Jurnal Teknik Sipil dan Arsitektur Vol 8, No 1 (2012): Mei
Publisher : Universitas Negeri Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (384.266 KB) | DOI: 10.21831/inersia.v8i1.3697

Abstract

The aim research are (1) Delay in the implementation of the project; (2) Thebank capital; (3) materials of project; (4) relationship betwen Owner, projectconsultant, and contractor. This research was conducted in Sleman Daerah IstimewaYogyakarta. The sampleof this research is 15 person, with random sampling. Thedata of Analysis using Descriptive of quantitative and percentage. The result aredelay in the implementation of the project, the bank capital were 38.5% and 53.3%respectively. The relationship betwen Owner, project consultant, and contractor werethe result 43,8%. Thats means the relationship is unfavourable.Keyword: project, relationship