Jurnal Manajemen dan Bisnis (Performa)
Vol 13, No 2 (2016)

MEMINIMUMKAN WAKTU PRODUKSI SANDAL DENGAN PENJADWALAN METODE CDS (Studi pada CV AWMK)

Asni Mustika Rani (Universitas Islam Bandung)



Article Info

Publish Date
07 Sep 2016

Abstract

Scheduling is said to be good when it can meet the needs of companies and consumers feel satisfied. The purpose of scheduling is to minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce costs. The problem in terms of punctuality causes unfulfilled consumer demand. The purpose of this study is to analyze the current production scheduling in CV AWMK, what methods are used and recommend production scheduling to minimize production time. The results showed that the production scheduling with CDS method can minimize production time, 15 days faster than by using the current production scheduling.

Copyrights © 2016






Journal Info

Abbrev

performa

Publisher

Subject

Decision Sciences, Operations Research & Management Economics, Econometrics & Finance Social Sciences

Description

Performa Journal publishes articles and brief communication with management theme (marketing, human resources, financial, operations, startegy), Islamic ecomy general economy, islamic and general approches development study, business in islamic and general basis. ...