Journals Mining Engineering : Bina Tambang
Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang

ANALISIS KELAYAKAN INVESTASI MENGGUNAKAN METODA DISCOUNTED CASH FLOW TAMBANG GALENA PT. TRIPLE EIGHT ENERGY, KECAMATAN KOTO PARIK GADANG DIATEH KABUPATEN SOLOK SELATAN PROVINSI SUMATERA BARAT

Dirga Sidauruk (Universitas Negeri Padang)
Muhammad Giatman (Universitas Negeri Padang)
Murad Murad (Universitas Negeri Padang)



Article Info

Publish Date
30 Apr 2018

Abstract

To perform the feasibility analysis of investment can be done by using severalmethods, PT. Triple Eight Energy with galena commodity using discounted cash flowas its method of analysis. Based on the calculation, obtained cash out flow of Rp649.289.950.100, cash in flow of Rp 2.361.317.978.504, NPV of Rp 789.154.337.450,payback period for 2 years 7,4 months, discounted payback period for 2 years 3, 5months, IRR of 30.98%, PI of 23.6300447. From these calculations it can beconcluded that, galena mine PT. Triple Eight Energy is economically viableKata kunci: analisis investasi, tambang galena, discounted cash flow

Copyrights © 2018






Journal Info

Abbrev

mining

Publisher

Subject

Earth & Planetary Sciences

Description

Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini ...