KURVATEK
Vol 4 No 2 (2019): November 2019

PENGARUH PENAMBAHAN GULA PASIR TERHADAP WAKTU IKAT AWAL PASTA SEMEN DAN MORTAR

Retno Trimurtiningrum (Unknown)
Sutriono, Bantot (Unknown)
Arrowrichta, Billy (Unknown)
Watu, Hiasintus Bertus (Unknown)



Article Info

Publish Date
21 Dec 2019

Abstract

In concrete construction process, it is often happened that the location of batching plan is different from the project location, so it takes time in its material transport. To prevent the concrete material from early setting time before casting, it is necessary to add chemical admixture to slow the setting time, which is retarder. Generally, chemical admixtures including retarder have relatively expensive price. Therefore, this study used alternative material such as sugar, because sugar is one of retarder’s consituent material that has relatively low price and also easy to obtain. The percentage of sugar in this research were 0% (as a control specimen); 0.03%; 0.05% and 0.1%. The setting time test used the Vicat neddle apparatus for cement paste and penetration resistance tools for mortar. The setting time result shows that sugar can delay the initial setting time on cement paste or mortar specimens. The longest initial setting time was obtained by a mixture that has been added 0,1% of sugar which is 157,69 minutes for cement paste test and 250 minutes for mortar specimen.

Copyrights © 2019






Journal Info

Abbrev

krvtk

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Earth & Planetary Sciences Electrical & Electronics Engineering Engineering Social Sciences

Description

Jurnal KURVATEK diterbitkan pertama kali tahun 2016 oleh Pusat Penelitian dan Pengabdian masyarakat pada Sekolah Tinggi Teknologi Nasional Yogyakarta. Jurnal ini mempunyai misi sebagai media pengembangan ilmu pengetahuan dan teknologi dalam bidang geologi, pertambangan, elektro, sipil, material ...