JeLAST : Jurnal Teknik Kelautan , PWK , Sipil, dan Tambang
Vol 2, No 2 (2016): JURNAL MAHASISWA TEKNIK SIPIL EDISI JUNI 2016

TINJAUAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN DAN ARSIP DAERAH KEC. SUKADANA

Yahya, - (Unknown)
Rafie, - (Unknown)
Syahrudin, - (Unknown)



Article Info

Publish Date
17 Jun 2016

Abstract

A project implementation should meet three criteria, namely the cost of the project, quality of work and job completion time. If the project costs less, there will be many obstacles, such as the quality of the work is less than the prescribed standards, hampered the work time, and so on. There are so many factors that should be reviewed in determining the costs should be provided, such as the type of activities that will be carried out in a project, the cost or unit price of an activity, the level of activity, the price of materials needed, the price of wages, and the like. The purpose of this final project was to determine the magnitude of the budget on the project and know the duration or length of time to work there. The amount of budget costs involved in building projects the District Library and Regional Archives Sukadana is Rp. 3,784,526,300, -. The length of time the work on the project is 138 days.   Keywords: Project, Labor, Time, Cost, Prices

Copyrights © 2016






Journal Info

Abbrev

JMHMS

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Pesatnya perkembangan di dunia pendidikan mengakibatkan peningkatan kebutuhan terhadap bangunan tinggi sebagai sarana dalam kegiatan belajar mengajar di sekolah. Bersumber pada Standar Nasional Indonesia (SNI 1726-2019) mengenai Tata Cara Perencanaan Ketahanan Gempa untuk Struktur Bangunan Gedung ...