NEUTRON : Research from all areas of the Civil Engineering
Vol 19 No 2 (2020): JANUARI 2020

OPTIMIZATION OF PROJECT DURATION USING CPM METHOD AND MONTE CARLO CRYSTAL BALL SIMULATION

Muhammad Chilmi (Universitas Narotama)
Diah Ayu Restuti Wulandari (Universitas Narotama)



Article Info

Publish Date
31 Jan 2020

Abstract

There are many aspects of uncertainty on the project that affect accuracy in the process of the making project schedule, so it needs analysis of the probability of the scheduling and sensitivity of work that affects to completion total duration of the project. The existing schedule of the project Laves Mall proved was late because ignored the uncertainty aspects, by using monte Carlo crystal ball simulation will help to find completion duration of the project with the most efficiency duration, Existing completion duration project is 500 days started on 6 July 2018 to 1 December 2019, after simulation change into 604 days and the project started same as existing duration which is on 6 July 2018 to 15 March 2020 by the deviation of the duration is 104 days or about 3 months. And the highest sensitivity work activity that affects the entire duration completion of projects is cutting off of head pile cap work with sensitivity percentage is 18,8%.

Copyrights © 2020






Journal Info

Abbrev

neutron

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

s an open-access journal publishing original research from across all areas of the Civil Engineering We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer ...