NEUTRON : Research from all areas of the Civil Engineering
Vol 20 No 01 (2020): JULY 2020

COMPARISON OF CONVENTIONAL SLAB AND METAL DECK COMPOSITE SLAB METHOD TO TIME AND COST IN TRANSPARK CIBUBUR PROJECT

Anjas Handayani (Universitas Mercu Buana)
Mochamad Elvan Reza (Universitas Mercu Buana)



Article Info

Publish Date
31 Jul 2020

Abstract

in the implementation of the Transpark Cibubur project, especially in Tower C Apartment there are several problems in conventional slab methods including the need for a longer construction time. With some thoughts and considerations, the work method of floor slab was changed from conventional method to metal deck composite slab method. In this research, a comparative of conventional slab and metal deck composite slab method in Tower C of the Cibubur Transpark Project is the object of research to compare the two methods to speed of implementation and cost requirements. The analysis results show in Tower C 16th to 19th floor for metal deck composite slab method is more expensive than conventional slab method with a cost difference Rp. 137.252.215,54. While in terms of work time, conventional slab method are longer than metal deck composite slab method with a time difference for 25 days.

Copyrights © 2020






Journal Info

Abbrev

neutron

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

s an open-access journal publishing original research from across all areas of the Civil Engineering We offer our authors a highly respected home for their research. Partnering with our extensive network of expert peer reviewers, our editorial team provides rigorous, objective and constructive peer ...