TELKOMNIKA (Telecommunication Computing Electronics and Control)
Vol 18, No 1: February 2020

Peripheral interface controller-based maximum power point tracking algorithm for photovoltaic DC to DC boost controller

Z. A. Ghani (Universiti Teknikal Malaysia Melaka)
E. Onn (Universiti Teknikal Malaysia Melaka)
M. Y. Zeain (Universiti Teknikal Malaysia Melaka)
Apriana Toding (Universitas Kristen Indonesia Paulus Makassar (UKIP Makassar))
F. A. Azidin (Universiti Teknikal Malaysia Melaka)
H. Othman (Universiti Kebangsaan Malaysia)
Z. Zakaria (Universiti Teknikal Malaysia Melaka)
H. S. Lago (Universiti Malaysia Sabah)



Article Info

Publish Date
01 Feb 2020

Abstract

A method of developing a maximum power point tracking (MPPT) algorithm for photovoltaic (PV) utilizing a peripheral interface controller (PIC) is presented in this paper. The efficiency and adequacy of a PV depend on the temperature and the exposed position to the sun. Thus, there is an optimum point at which the operating power is at maximum. The goal is to operate the PV module at this point (MPP). It can be accomplished by using the MPPT algorithm designed with a DC-DC boost converter. The boost converter, MPPT circuit, PIC18F4550 microcontroller and PV panel are the main components used in this design. The current and voltage produced by the solar panel are observed continuously by a closed-loop control system. The microcontroller-based control system adjusts the duty cycle of the converter to extract the maximum power. With a DC input voltage of 15 V, the boost converter is capable of generating an output voltage of an approximately 60 Vdc at a maximum power of 213.42 W with minimum voltage ripple as compared to 84 W without the MPPT. It proved the effectiveness of the developed algorithm.

Copyrights © 2020






Journal Info

Abbrev

TELKOMNIKA

Publisher

Subject

Computer Science & IT

Description

Submitted papers are evaluated by anonymous referees by single blind peer review for contribution, originality, relevance, and presentation. The Editor shall inform you of the results of the review as soon as possible, hopefully in 10 weeks. Please notice that because of the great number of ...