IJEBD (International Journal Of Entrepreneurship And Business Development)
Vol 3 No 2 (2020): March 2020

Analysis of Operational Delay and Additional Investment Costs, As An Investment Consideration

Dina Yunanda (Management of Technology Department Sepuluh Nopember Institute of Technology Surabaya, Indonesia)
Christiono Utomo (Civil Engineering Department Sepuluh Nopember Institute of Technology Surabaya, Indonesia)
Maranatha Wijayaningtyas (Civil Engineering Department National Institute of Technology Malang, Indonesia)



Article Info

Publish Date
30 Mar 2020

Abstract

Purpose: This paper aims to Analysis of Operational Delay and Additional Investment Costs, As an Investment Consideration: Case in Malang Pandaan Toll Road. Design/methodology/approach: The method used is statistic-descriptive and the design used is cross sectional. Findings: 2 hypotheses are while the other is accepted. Research limitations/implications: Variables considered in this study are electronic word of mouth, brand image, brand trust, and interest in saving. The scope of work of the Pandaan Malang Toll Road project has a length of 38 + 488 km, passing through two regions in Figure 1. Practical implications: Results show that from the 2 hypotheses proposed. Originality/value: This paper is original. Paper type: This paper can be categorized as a case study.

Copyrights © 2020






Journal Info

Abbrev

ijebd

Publisher

Subject

Economics, Econometrics & Finance

Description

Focus and Scope IJEBD International Journal of Entrepreneurship and Business Development is an international, peer-reviewed journal publishing articles on all aspects of Entrepreneurship and Business Development. All accepted articles will be published on payment of an article-processing charge, and ...