Competition in this globalization era has led manufacturing enterprises improving their production andservices by enhancing the engine utility and accuracy in the production completion to meet the schedule set. PT. XYZ is a company engaged in the automotive industry, especially in the field of stamping parts or four-wheeled vehiclescomponents. The purpose of this study is to minimize the processing time (makespan) of the ISUZU stamping parts production process in the Line B of PT. XYZ. The proposed scheduling method consists of two: Campbell, Dudek, and Smith (CDS) and Nawaz, Enscore and Ham (NEH). CDS Methods combine machines sorted from the smallest to the largest based on the Johnsons rule. NEH heuristic sorted the job in two different sequences (J1-J2 and J2-J1), selected the smallest makespan and carried it on until the n jobs. The two methods applied resulted in different job sequences to be compared with the scheduling applied in the company. NEH method is a method with the best makespan time which is 4,858 minutes. It can save 252 minutes of scheduling makespan from the original schedule of 5,110 minutes. Keywords:            scheduling the series, the method of Campbell, Dudek and Smith (CDS), the method Nawaz, Enscore and Ham (NEH), makespan
Copyrights © 2013