Jurnal Teknik Sipil Cendekia (JTSC)
Vol 2 No 2 (2021): Juli

ANALISIS PENEMPATAN DAN PENENTUAN JUMLAH TOWER CRANE (TC)

Syapril Janizar (syapriljanizar)
Eko Rizky Suprapto (Teknik Sipil Universitas Winaya Mukti)



Article Info

Publish Date
30 Sep 2021

Abstract

In the construction of Cable Stayed Bridge, the use of heavy construction equipment is absolutely necessary, especially required for positioning and selecting the type of Tower Crane in order to improve construction performance. Therefore, human resources and heavy equipment used in the construction process will significantly affect the period of project implementation. Proper planning of the location for various construction equipment is believed to be the key of efficiency and productivity. Tower Crane as the target optimization is one of the equipment that has a big role in transporting the materials for the construction of a multi- storey building so that it requires proper planning to be able to serve all points of demand from its position.

Copyrights © 2021






Journal Info

Abbrev

jtsc

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

JTSC: Jurnal Teknik Sipil Cendekia is published by Civil Engineering Study Program, Faculty of Engineering, Planning and Architecture, University Winaya Mukti. This peer-reviewed journal is designated to publish articles that report the results of research in civil engineering science. JTSC: Jurnal ...