Eko Rizky Suprapto
Teknik Sipil Universitas Winaya Mukti

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS PENEMPATAN DAN PENENTUAN JUMLAH TOWER CRANE (TC) Syapril Janizar; Eko Rizky Suprapto
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 2 No 2 (2021): Juli
Publisher : Faculty of Engineering, Planning and Architecture, Winaya Mukti University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (550.06 KB) | DOI: 10.51988/jtsc.v2i2.35

Abstract

In the construction of Cable Stayed Bridge, the use of heavy construction equipment is absolutely necessary, especially required for positioning and selecting the type of Tower Crane in order to improve construction performance. Therefore, human resources and heavy equipment used in the construction process will significantly affect the period of project implementation. Proper planning of the location for various construction equipment is believed to be the key of efficiency and productivity. Tower Crane as the target optimization is one of the equipment that has a big role in transporting the materials for the construction of a multi- storey building so that it requires proper planning to be able to serve all points of demand from its position.