With the current economic conditions , construction projects are required to work more pressure oncosts while maintaining the quality of the project . One alternative that is applied to achieve the requiredfunctions with optimal cost and the end result is Value Engineering . The purpose of this study to applyValue Engineering in construction projects . One project in the works is a Road Maintenance Project Waru -Taman - Krian Bypass. Value engineering is a creative way and planned approach in order to identify andstreamline costs unnecessary . Value engineering is used to find an alternatives or ideas which aim to producea better cost / lower than previously planned with functional limitations and quality of the work . Applicationof Value Engineering work done on Aggregate Base . Value Engineering Analysis performed on RoadMaintenance Project Waru - Taman - Krian By Pass. The problem studied is how to bring out the alternativesas a substitute on the job Aggregate Base . This study aims to determine the amount of cost savings thatoccur after the implementation of the Value Engineering Aggregate base layer A , B with CTB. Measures ofValue Engineering work is composed of four (4) phases: the high cost of information includes theidentification and identification of unnecessary cost ( analysis function ) ; creative stage ; analysis phaseincludes the selection of alternative with profit and loss analysis , cost analysis of alternatives to stage of theproject life cycle as well as recommendations. By comparing construction costs between the base layerconstruction Aggregate Aggregate A and B with the construction of the foundation layer using CTB , thenthe cost is obtained as follows : a. The cost of construction material with foundation construction Aggregate Class A and B : Rp .260.503,77 per M1 x 5500 = Rp . 1.432.770.735,00b . Construction costs by using foundation materials Cement Trade Base ( CTB ) : Rp . 176.361,84 Per M1 x 5500 = Rp. 969.990.120,00The second calculation of the cost of construction can be analyzed , that the construction of the foundation materials CTB can cut costs. So the difference in cost of construction happening isRp . 462.780.615,00Keywords : Value Engineering , CTB .

Copyrights © 2013






Journal Info

Abbrev

exp

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Focus and Scope Extrapolasi is published by Department of Civil Engineering Faculty of Technology, Universitas 17 Agustus 1945 Surabaya. The Extrapolasi editorial is very open in accepting articles related to : Building Materials and Structures Constructions Technology Constructions Management, Road ...