Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil
Vol 2 No 2: September 2019

Studi Pengaruh Temperature dan Pembuatan Beton Massa dengan Ketebalan 4 Meter (Studi Kasus : Proyek Gunawangsa Tidar Apartement Surabaya)

Wardhani, Fitri Swastika (Unknown)
Koespiadi, Koespiadi (Unknown)



Article Info

Publish Date
30 Sep 2019

Abstract

Building a building with a large and large number of foundations requires a mass casting method. In mass casting work requires observation and analysis of temperature in order to find out the peak temperature and no thermal cracks occur. In this Final Project aims to determine the effect of mass concrete temperature on the raft foundation of the Surabaya Gunawangsa Tidar Aparment Project. The project has 25 types of raft foundations, but the ones with large dimensions and mass casting are pile cap 114 and pile cap 119. Mass casting is carried out in a full day so after casting it is necessary to observe the effect of concrete temperature. The effect of temperature observed was peak temperature, temperature difference, and statistical hypothesis testing. In general, the peak temperature at ijinkam is 78.20Ëš C with a difference in temperature of 20ËšC. Observations on pile cap 114 and pile cap 119 are safe and have no thermal cracks.

Copyrights © 2019






Journal Info

Abbrev

gestram

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Ge-STRAM journal published 2 (two) times a year in March and September. This journal presents scientific articles on the results of research, scientific studies, analysis and critical review of the problems closely related to the field of civil engineering. The manuscript will be received by the ...