JURNAL ELEKTRO
Vol 13 No 1 (2020): Jurnal Elektro: April 2020

PERBANDINGAN PENEMPATAN PANEL FOTOVOLTAIK DI ATAS TANAH (GROUND MOUNTING PV) ATAU DI ATAS ATAP (ROOFTOP PV) SEBAGAI IMPLEMENTASI PEMANFAATAN PLTS YANG EFISIEN DI ITERA

Syamsyarief Baqaruzi (Unknown)
Kiki Kananda (Unknown)
Ali Muhtar (Unknown)



Article Info

Publish Date
19 Oct 2020

Abstract

The use of photovoltaic panels (PV) as the latest material technology to conversion solar energyinto electrical energy, so as it can become a Solar Power Plant (PLTS) which is more continues to growin this world, including Institut Teknologi Sumatera (ITERA). As a new campus technology-based inLampung Province which also has high solar potential, it is considered appropriate to be able to applyphotovoltaic as the key to the use of renewable energy. The PV panel studied is a comparison with theplacement conditions, specifically placement on the rooftop and on the groundmounting. In order to getthe best efficiency from the comparison of the installed photovoltaic panels, it is necessary to design anequivalent circuit with a load or no load in designing, as well as making observations for 7 days withthe same conditions. The results show that the placement of PV on the rooftop is 1,129.91 Wh for aloaded condition and 3,961.91 Wh for a no-load condition, while the placement of PV on thegroundmounting is 1,064.83 Wh for a loaded condition and 3,880.13 for a no-load condition. Fromthese results, it becomes the basis for the placement of PV as needed before planning the constructionof PLTS.

Copyrights © 2020






Journal Info

Abbrev

jte

Publisher

Subject

Computer Science & IT Control & Systems Engineering Electrical & Electronics Engineering

Description

Jurnal Elektro diterbitkan oleh Program Studi Teknik Elektro, Fakultas Teknik Unika Atma Jaya Jakarta. Jurnal Elektro terbuka untuk penelitian dalam bidang-bidang teknik elektro seperti elektro arus kuat, elektronika, sistem kontrol atau kendali, telekomunikasi, komputer dan berbagai sub topik yang ...