Nusantara Science and Technology Proceedings
1st International Conference Eco-Innovation in Science, Engineering, and Technology

Line Balancing Techniques for Efficiency Improvement in Construction Steel Company

Pulansari, Farida (Unknown)
Sulaiman, Yoga Aulia (Unknown)
Restu (Unknown)



Article Info

Publish Date
03 Nov 2020

Abstract

XYZ company is a company engaged in steel construction. This company produces steel construction with several classifications, namely Building Construction (structure) and Mining Construction (Conveyor and Tank). This problem is found in the production process area where the efficiency of the company is not optimal because of the bottleneck between workstations. To increase efficiency and reduce bottlenecks, companies use the Largest Candidate Rule (LCR); Killbridge and the Western Method (KWM); and the Ranked Positional Weights (RPW) Method. After comparing the three methods, LCR has the best results. Production line efficiency is 92.2%, balance delay is 7.8%, and the smoothness index is 14.6 with 11 operators.

Copyrights © 0000






Journal Info

Abbrev

nuscientech

Publisher

Subject

Agriculture, Biological Sciences & Forestry Chemical Engineering, Chemistry & Bioengineering Economics, Econometrics & Finance Engineering Law, Crime, Criminology & Criminal Justice Materials Science & Nanotechnology Medicine & Pharmacology

Description

NST Proceeding supports regional research communities to globalise their findings in Science and Technology by providing an open access, online platform in line with international publishing standards and indexing scholarly conference proceedings. The current emphasis of the NST Proceeding includes ...