Estimasi Waktu Untuk Pengadaan Material Berdasarkan Time Schedule Pada Proyek Pembangunan Ruko Kawasan SP Plaza Batu Aji

Wico Mindra Putra (Universitas Internasional Batam)
Usmanul Hayadi Umar (Universitas Internasional Batam)



Article Info

Publish Date
30 Jun 2021

Abstract

The research aims to estimate the time for material procurement based on time schedule in Batu Aji SP Plaza Area. The method used in the determining the estimated time is conventional method in which the scheduling process is made in the form of a barchart to be more easily understood by readers and also makes scheduling more orderly and systematic. The estimated results of material procurement until arrived the project location is 15 days and the average real field procurement is 12 days, so it can be concluded that the material procurement process in the construction of Ruko Kawasan SP Plaza does not occure material delays for structural work, wall work and roof work.

Copyrights © 2021






Journal Info

Abbrev

jce

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Control & Systems Engineering Engineering Transportation

Description

JCEP is an article about research activities with the theme of study of Civil Engineering. Published articles are findings or reflections from research activities that are disseminated for practice by relevant stakeholders. Dissemination in articles published by JCEP is not limited to ideas, methods ...